موردونا

مواصفات المواد

NUMBER ITEM DESCRIPTION REV. DATE
PART 1 CONCRETE FOUNDATIONS 1 07/2019
PART 2 INSTALLATION OF KWH METER BOXES ON FRONT CONSUMER WALLS AND SIDE INSETS  2 11/2021
PART 3 INSTALLATION OF RECESSED TYPE KWH METER BOXES INTO  CONSUMER'S WALL 1 01/2009
PART 4 INSTALLATION OF DISTRIBUTION PILLARS 0 02/2006
PART 5 INSTALLATION OF FIBERGLASS REINFORCED LOW VOLTAGE SERVICE CABINET FOR 800 A CONSUMERS 0 01/2009
PART 7 INSTALLATION OF KWH METER BOXES INSIDE METER ROOMS 0 12/2011
PART 8 PROTECTIVE BARRIERS 0 10/2016
PART 9 INSTALLATION OF 13.8 & 33 KV SINGLE TRANSFORMER ROOM SUBSTATION 0 12/2012
PART 10 13.8 & 33 KV METERED RING MAIN UNIT SF6 ROOM SUBSTATIONS 0 11/2016
PART 11 SECURITY FENCE FOR UNIT SUBSTATIONS AND RMU’S 2 02/2025
PART 12 UNIT SUBSTATION + RMU LAYOUT 0 08/2019
PART 13 ROOF AND DOOR CANOPY WATERPROOFING 0 08/2019
PART 14 OUTDOOR METERING KIOSK 0 08/2019
PART 15 SINGLE METER BOX FOR TEMPORARY PROJECT 0 08/2019
PART 16 MANHOLE 0 08/2019
PART 17 CABLE TRENCHES 0.2 03/2022
PART 18 PRECAST MINI MANHOLE & HANDHOLE 0 03/2022
PART 19 GUIDELINES FOR CONCRETE DUCTBANK & MANHOLE 0 12/2023
PART 21 INSTALLATION OF TEMPORARY METER BOX ON METALLIC FRAME WITH CONCRETE FOUNDATION 0 02/2024