LOADS DISPLACEMENT

Electrical load displacement can be defined as the reduction of the maximum amount of the electrical peak load during the day by rescheduling some of the loads that cause the peak load to times outside peak hours during the day; thus, easing the right programming for the additions and expansion of the electrical system components. Peak time is defined as the time during which the electrical loads rise to their maximum level. To SEC, peak time is the time from (12:00pm to 05:00pm) Saturday through Thursday.